§ 1. Building services.  


Latest version.
  • Residential Building $1.00—$500.00 construction value (cv)—$23.50
    $501.00—$2,000.00 cv—$23.50 for the first $500.00, plus $3.05 for each additional $100.00 or fraction thereof to and including $2,000.00
    $2,001.00—$25,000.00 cv—$69.25 for the first $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof to and including $25,000.00
    $25,001.00—$50,000 cv—$391.25 for the first $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof to and including $50,000.00
    $50,001.00—$100,000.00 cv—$643.75 for the first $50,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
    $100,001.00—$500,000.00 cv—$993.75 for the first $100,000.00, plus $5.60 for each additional $1,000.00 or fraction thereof to and including $500,000.00
    $500,001—$1,000,000 cv—$3,233.75 for the first $500,000.00, plus $4.75 for each additional $1,000.00 or fraction thereof to and including $1,000,000.00
    $1,000,001.00 and over cv—$5,608.75 for the first $1,000,000.00, plus $3.65 for each additional $1,000.00 or fraction thereof
    Example: Value $300,000.00, Square Foot Cost: $112.65, Square Feet: 2,663 ($5.60 x 200 = $1,120.00 + $993.75 = $2,113.75
    Residential Additions Same as proposed residential building
    Example: Value: $49,000.00, Square Foot Cost: $112.65, Square Feet: 434.97 ($10.10 x 24 = $242.40 + $391.25 = $633.65)
    Residential Alterations Same as proposed residential building
    Example: Value: $49,000.00, Square Foot Cost: $112.65, Square Feet: 434.97 ($10.10 x 24 = $242.40 + $391.25 = $633.65)
    Accessory Buildings Same as proposed residential building
    Example: Value: $25,000.00, Square Foot Cost: $112.65, Square Feet: 222.22 ($14.00 x 23 = $322 + $69.25 = $391.25)
    Building Permit Fees—Commercial $23.50 $1.00—$500.00 construction value (cv)
    $23.50 $501.00—$2,000.00 cv—First $500.00, plus $3.05 for each additional $100.00 or fraction thereof to and including $2,000.00; 65% of building permit fee (BPF) for plan review; plus $50.00/year contractor registration;
    $69.25 $2,001.00—$25,000 cv—First $2,000.00, plus $14.00 for each additional $1,000.00 or fraction thereof to and including $25,000.00; 65% of BPF for plan review; plus $50.00/year contractor registration;
    $391.25 $25,001.00—50,000.00 cv—First $25,000.00, plus $10.10 for each additional $1,000.00 or fraction thereof to and including $50,000.00; 65% of BPF for plan review; plus $50.00/year contractor registration;
    $643.75 $50,001.00—$100,000.00 cv—First $50,000.00, plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00; plus 65% of BPF for plan review; plus $50.00/year contractor registration;
    $993.75 $100,001.00—$500,000.00 cv—First $100,000.00, plus $5.60 for each additional $1,000.00 or fraction thereof to and including $500,000.00; plus 65% of BPF for plan review; plus $50.00/year contractor registration;
    $3,233.75 $500,001.00—$1,000,000.00 cv—First $500,000.00, plus $4.75 for each additional $1,000.00 or fraction thereof to and including $1,000,000.00; plus 65% of BPF for plan review; plus $50.00/year contractor registration;
    $5,608.75 Over $1,000,000.00 cv—First $1,000,000, plus $3.65 for each additional $1,000.00 or fraction thereof; plus 65% of BPF for plan review; plus $50.00/year contractor registration;
    Commercial (new construction, additions and alterations)—Based on current building valuation table created by the International Code Council (ICC) which utilizes regional building valuation data upon which commercial building permit fees will be determined (see Attachment A).
    Certificate of Occupancy $50.00
    *Only charged when no building permit is issued for construction.
    Electrical Fee—Commercial $35.00/Permit—sq. feet up to 500
    $50.00/Permit—sq. feet up to 1,499
    $75.00/Permit—sq. feet up to 1,999
    $100.00/Permit—sq. feet up to 2,499
    $125.00/Permit—sq. feet up to 2,999
    $125.00/Permit—sq. feet over 3,000, plus $20.00 for each additional 1,000 sq. feet
    Misc. Electrical Permit $50.00/permit
    *Only charged when no building permit is issued for construction
    Grading Permit/Tree Removal—Non Building Permit Related $25.00 per lot—residential
    $100.00 per lot—commercial
    $25.00 per acre—agricultural/undeveloped
    Property Maintenance Fee Actual cost for property maintenance, plus $250.00 administration fee
    Lien Fee Actual cost for filing lien, plus $250.00 administration fee and annual interest penalty of 10% to be applied monthly
    Fence Permit $50.00
    $0.00 (Replacement)
    Mechanical (HVAC) Fee—Commercial $35.00/Permit—sq. feet up to 500
    $50.00/Permit—sq. feet up to 1,499
    $7.005/Permit—sq. feet up to 1,999
    $100.00/Permit—sq. feet up to 2,499
    $125.00/Permit—sq. feet up to 2,999
    $125.00/Permit—sq. feet over 3,000, plus $20.00 for each additional 1,000 sq. feet
    Misc. Mechanical (HVAC) Permit $50.00/permit
    *Only charged when no building permit is issued for construction
    Mobile/Manufactured Home $100.00/Permit to include utility connection inspections
    Moving Permit $50.00/Permit
    Plumbing Fee—Commercial $35.00/Permit—sq. feet up to 500
    $50.00/Permit—sq. feet up to 1,499
    $75.00/Permit—sq. feet up to 1,999
    $100.00/Permit—sq. feet up to 2,499
    $125.00/Permit—sq. feet up to 2,999
    $125.00/Permit—sq. feet over 3,000, plus $20.00 for each additional 1,000 sq. feet
    Misc. Plumbing Permit $50.00/Permit—misc. plumbing (water heater/gas line to pool/spa)
    *Only charged when no building permit is issued for construction
    Re-Inspection Fee $50.00/for each additional re-inspection
    *Only assessed after an inspection fails more than once for the same violation
    Sign Permit $50.00 per sign permit
    Temporary Sign Permit $25.00 per sign
    Pool Permit $500.00/in-ground pools
    $50.00/above ground pools and spas/hot tubs
    Temporary Building Permit $50.00
    Demolition Permit $50.00
    Network Node (Small Cell) Permit Appliction Fee $320.00 per application
    Network Node (Small Cell) Right-of Way Use Fee $28.00 per node, per month
    Sidewalks/Curb Cut Fees Fees based on actual costs as derived from city's current miscellaneous concrete contract, maximum of $1,500.00
    Supplemental Plan Review Fee $50 per hour (minimum 2 hours residential and 3 hours commercial). Only assessed after original set of plans has been reviewed and approved for construction and changes are made to the plans by the developer/owner/ builder/representative
    Irrigation Permit $50.00 each—residential
    $100.00 each—commercial
    Miscellaneous Inspections $50.00 each
    Lost Packet Fee $50.00 each
    Map Printing Fees (new) 11" × 17" = None 22" x 34" = $15.00
    24" × 36" = $15.00
    36" × 48" and larger = $25.00
    Special Event Permit Fee $25.00
    No permit costs for non-profits
    $250.00—Security deposit
    $25.00 per hour/2 hour min.—Maintenance staff supplies at cost plus 10%

     

( Ord. No. 1905 , § 10, 9-18-18)